Grouping оf Complexes оf Multiphase Queuing Systems
DOI:
https://doi.org/10.14308/ite000052Keywords:
automatic grouping, complexes classification, composition graph, multiphase queuing systemAbstract
Issues of classification of the complexes of multiphase queuing system systems in correspondence with entrance-output correlations and automatic grouping of complexes by the analysis of the graph of final product composition is examined in this work.
Downloads
Download data is not yet available.
Metrics
Metrics Loading ...
References
<uk>
1. APICS dictionary. Еdit. Cox J. F., etc. American Production and Inventory Control Society. 1992. –54 p.
2. Уайт О. У. Управление производством и материальными запасами в век ЭВМ. – М.: Прогресс. 1978. – C. 302.
3. SAP R/3 System. Function in detail. Material Management. Production Planning, SAP. 1994. //Управление материальными потоками. Перевод на рус. яз. 1996 г.
4. Chan F.T.S.1. Effect of kanban size on just-in-time manufacturing systems, Source: Journal of Materials Processing Technology. Volume 116. Number 2. Elsevier Science. 24 October 2001. – 146-160 p.
5. Chakravorty S. S., Atwaters, J. B. Bottleneck management: theory and practice. Production Planning and Control, Taylor and Francis Ltd. Volume 17, Number 5, July 2006. – Р. 441-447.
6. Wu H.-H.; Yeh M.-L., A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows. International Journal of Production Research, Taylor and Francis Ltd. Volume 44, Number 5, Number 5/1 March 2006. – Р. 883-902.
7. Pegels C., Watrous C. Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, Emerald Group Publishing Limited, Volume 16, Number 3, 2005, pp. 302-311(10)
8. Винер Н. Кибернетика. – М., 1968. – 288 с.
9. Бурков В.Н., Новиков Д.А. Введение в теорию активных систем. – М.: Синтег, 1999. – 128с.
10. Aoki N., Hiraide K. Topological Theory of Dynamical Systems. Amsterdam, Netherlands: North-Holland, 1994. – 424 p.
11. Вентцель Е. С., Исследование операций. – М.: Советское радио, 1972. – 552 с.
12. Лукас В. А. Теория автоматического управления. – М.: Недра, 1990. – 416 с.
13. Организация, планирование и управление предприятием машиностроения. – М.: Высшая школа, 1979.
14. Куприянов Е.М. Стандартизация и качество промышленной продукции. – М.: Высшая школа, 1985.
15. Организация, планирование и управление предприятием радиоэлектронной аппаратуры. Под ред. И.Е. Куксина и С.В. Моисеева. – М.: Машиностроение, 1979.
16. Джеймс А. Университет Южной Каролины, Спартанбург. Москва • Санкт-Петербург • Киев, 2004. – 252-264 сс.
17. Новиков Ф. А. Дискретная математика для программистов. – Питер, 2000. – С. 192-208.
</uk>
<en>
1. APICS dictionary. Edit. Coh J. F., etc. American Production and Inventory Control Society. 1992. –54 p.
2. Uajt O. U. Upravlenije proizvodstvom i materijal'nymi zapasami v vek EVM. – M.: Progress. 1978. – C. 302.
3. SAP R/3 System. Function in detail. Material Management. Production Planning, SAP. 1994. //Upravlenije materjal'nymi potokami. Perevod na rus. jaz. 1996 g.
4. Chan F.T.S.1. Effect of kanban size on just-in-time manufacturing systems, Source: Journal of Materials Processing Technology. Volume 116. Number 2. Elsevier Science. 24 October 2001. – 146-160 p.
5. Chakravorty S. S., Atshaters, J. B. Bottleneck management: theory and practice. Production Planning and Control, Taylor and Francis Ltd. Volume 17, Number 5, July 2006. – R. 441-447.
6. Shu H.-H.; Jeh M.-L., A DBR scheduling method for manufacturing environments shith bottleneck re-entrant floshs. International Journal of Production Research, Taylor and Francis Ltd. Volume 44, Number 5, Number 5/1 March 2006. – R. 883-902.
7. Pegels C., Shatrous C. Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, Emerald Group Publishing Limited, Volume 16, Number 3, 2005, pp. 302-311(10)
8. Vyner N. Kybernetyka. – M., 1968. – 288 s.
9. Burkov V.N., Novikov D.A. Vvedenije v teoriju aktivnyh sistem. – M.: Sinteg, 1999. – 128 s.
10. Aoki N., Hiraide K. Topological Theory of Dynamical Systems. Amsterdam, Netherlands: North-Holland, 1994. – 424 p.
11. Ventcel' E. S., Issledovanie operacij. – M.: Sovetskoe radio, 1972. – 552 s.
12. Lukas V. A. Teorija avtomaticheskogo upravlenija. – M.: Nedra, 1990. – 416 s.
13. Organizacija, planirovanije i upravlenije predprijatijem mashynostroenija. – M.: Vysshaja shkola, 1979.
14. Kuprijanov E.M. Standartizacija i kachestvo promyshlennoj produkcii. – M.: Vysshaja shkola, 1985.
15. Organizacija, planirovanije i upravlenije predprijatijem radioelektronnoj apparatury. Pod red. I.E. Kuksina y S.V. Moiseeva. – M.: Mashinostroenije, 1979.
16. Dzhejms A. Universitet Juzhnoj Karoliny, Spartanburg. Moskva • Sankt-Peterburg • Kiev, 2004. – 252-264 ss.
17. Novikov F. A. Diskretnaja matematika dlja programmistov. – Piter, 2000. – S. 192-208.
</en>
1. APICS dictionary. Еdit. Cox J. F., etc. American Production and Inventory Control Society. 1992. –54 p.
2. Уайт О. У. Управление производством и материальными запасами в век ЭВМ. – М.: Прогресс. 1978. – C. 302.
3. SAP R/3 System. Function in detail. Material Management. Production Planning, SAP. 1994. //Управление материальными потоками. Перевод на рус. яз. 1996 г.
4. Chan F.T.S.1. Effect of kanban size on just-in-time manufacturing systems, Source: Journal of Materials Processing Technology. Volume 116. Number 2. Elsevier Science. 24 October 2001. – 146-160 p.
5. Chakravorty S. S., Atwaters, J. B. Bottleneck management: theory and practice. Production Planning and Control, Taylor and Francis Ltd. Volume 17, Number 5, July 2006. – Р. 441-447.
6. Wu H.-H.; Yeh M.-L., A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows. International Journal of Production Research, Taylor and Francis Ltd. Volume 44, Number 5, Number 5/1 March 2006. – Р. 883-902.
7. Pegels C., Watrous C. Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, Emerald Group Publishing Limited, Volume 16, Number 3, 2005, pp. 302-311(10)
8. Винер Н. Кибернетика. – М., 1968. – 288 с.
9. Бурков В.Н., Новиков Д.А. Введение в теорию активных систем. – М.: Синтег, 1999. – 128с.
10. Aoki N., Hiraide K. Topological Theory of Dynamical Systems. Amsterdam, Netherlands: North-Holland, 1994. – 424 p.
11. Вентцель Е. С., Исследование операций. – М.: Советское радио, 1972. – 552 с.
12. Лукас В. А. Теория автоматического управления. – М.: Недра, 1990. – 416 с.
13. Организация, планирование и управление предприятием машиностроения. – М.: Высшая школа, 1979.
14. Куприянов Е.М. Стандартизация и качество промышленной продукции. – М.: Высшая школа, 1985.
15. Организация, планирование и управление предприятием радиоэлектронной аппаратуры. Под ред. И.Е. Куксина и С.В. Моисеева. – М.: Машиностроение, 1979.
16. Джеймс А. Университет Южной Каролины, Спартанбург. Москва • Санкт-Петербург • Киев, 2004. – 252-264 сс.
17. Новиков Ф. А. Дискретная математика для программистов. – Питер, 2000. – С. 192-208.
</uk>
<en>
1. APICS dictionary. Edit. Coh J. F., etc. American Production and Inventory Control Society. 1992. –54 p.
2. Uajt O. U. Upravlenije proizvodstvom i materijal'nymi zapasami v vek EVM. – M.: Progress. 1978. – C. 302.
3. SAP R/3 System. Function in detail. Material Management. Production Planning, SAP. 1994. //Upravlenije materjal'nymi potokami. Perevod na rus. jaz. 1996 g.
4. Chan F.T.S.1. Effect of kanban size on just-in-time manufacturing systems, Source: Journal of Materials Processing Technology. Volume 116. Number 2. Elsevier Science. 24 October 2001. – 146-160 p.
5. Chakravorty S. S., Atshaters, J. B. Bottleneck management: theory and practice. Production Planning and Control, Taylor and Francis Ltd. Volume 17, Number 5, July 2006. – R. 441-447.
6. Shu H.-H.; Jeh M.-L., A DBR scheduling method for manufacturing environments shith bottleneck re-entrant floshs. International Journal of Production Research, Taylor and Francis Ltd. Volume 44, Number 5, Number 5/1 March 2006. – R. 883-902.
7. Pegels C., Shatrous C. Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal of Manufacturing Technology Management, Emerald Group Publishing Limited, Volume 16, Number 3, 2005, pp. 302-311(10)
8. Vyner N. Kybernetyka. – M., 1968. – 288 s.
9. Burkov V.N., Novikov D.A. Vvedenije v teoriju aktivnyh sistem. – M.: Sinteg, 1999. – 128 s.
10. Aoki N., Hiraide K. Topological Theory of Dynamical Systems. Amsterdam, Netherlands: North-Holland, 1994. – 424 p.
11. Ventcel' E. S., Issledovanie operacij. – M.: Sovetskoe radio, 1972. – 552 s.
12. Lukas V. A. Teorija avtomaticheskogo upravlenija. – M.: Nedra, 1990. – 416 s.
13. Organizacija, planirovanije i upravlenije predprijatijem mashynostroenija. – M.: Vysshaja shkola, 1979.
14. Kuprijanov E.M. Standartizacija i kachestvo promyshlennoj produkcii. – M.: Vysshaja shkola, 1985.
15. Organizacija, planirovanije i upravlenije predprijatijem radioelektronnoj apparatury. Pod red. I.E. Kuksina y S.V. Moiseeva. – M.: Mashinostroenije, 1979.
16. Dzhejms A. Universitet Juzhnoj Karoliny, Spartanburg. Moskva • Sankt-Peterburg • Kiev, 2004. – 252-264 ss.
17. Novikov F. A. Diskretnaja matematika dlja programmistov. – Piter, 2000. – S. 192-208.
</en>
Downloads
Published
09.12.2009
How to Cite
Zholtkevych Г., Nazyrov З., & Ignatov . С. (2009). Grouping оf Complexes оf Multiphase Queuing Systems. Journal of Information Technologies in Education (ITE), (3), 044–056. https://doi.org/10.14308/ite000052
Issue
Section
Articles
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.